Asset Reliability Services and Training
 Asset Reliability Services and Training

Compression Systems Best Practices

This document has been produced on behalf of the Unplanned Losses

Working Group (ULWG) of Oil and Gas UK. Its objectives are to identify the causes of unplanned losses in the North Sea and to push for action within and between companies to reduce them. The Members of the ULWG are Chevron, Talisman Sinpoec Energy,
Taqa, and Schlumberger Business Consulting (SBC).

 

Chris James produced the content of this document (in collaboration with others) when working with SBC

Compression Systems Best Practices
Compression Systems are estimated to be responsible for $2bn in losses per year from the UK Continental Shelf. Many of the causes of compressor problems are known yet they are not addressed. The issues are therefore as much Managerial as Technical. This document describes 9 best practices for the management of compressors
Compression Systems Best Practices Jan 2[...]
Adobe Acrobat document [531.2 KB]
Print | Sitemap
© Reliability Management Ltd